Close Menu
Chronicle NG
    Trending Stories
    CAF Awards 2024: Nigeria's Super Falcons named team of the year

    Super Falcons lose automatic World Cup ticket after 1-0 Cameroon defeat

    August 9, 2026
    Atiku Abubakar criticises Tinubu administration over 5,091 reported killings

    Atiku says 5,091 killings expose Tinubu’s security failure

    August 9, 2026
    2027: INEC extends deadline for parties to upload candidates August 11

    2027: INEC extends deadline for parties to upload candidates August 11

    August 9, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Super Falcons lose automatic World Cup ticket after 1-0 Cameroon defeat
    • Atiku says 5,091 killings expose Tinubu’s security failure
    • 2027: INEC extends deadline for parties to upload candidates August 11
    • Messi faced multiple death threats during 2026 World Cup
    • US condemns Chinese actions in South China Sea
    • Niger residents protest abductions, block highway
    • Osun commissioner released after police arrest
    • Troops rescue 33 abducted travelers in Zamfara
    Facebook X (Twitter) Instagram
    Chronicle NGChronicle NG
    Subscribe
    Sunday, August 9
    • News
      • Nigeria News
      • World News
      • Headlines News
    • Politics
    • Business
    • Sport
    • Entertainment
    • Contact Us
    Chronicle NG

    Blackout hits Abuja as TCN begins two days maintenance 

    Opalim LiftedBy Opalim LiftedDecember 28, 2024No Comments3 Mins Read
    Facebook Twitter Telegram WhatsApp
    Why DisCos switch off power during heavy rain
    A file photo of blackout
    Facebook Twitter WhatsApp

    The Transmission Company of Nigeria (TCN) has notified residents of the Federal Capital Territory about impending blackouts in some areas.

    In a statement issued on Saturday by its General Manager, Public Affairs, Ndidi Mbah, TCN announced that its engineers would conduct planned maintenance exercises at two transmission substations between Saturday and Sunday.

    The statement noted that from 9 a.m. to 1 p.m. on Saturday, “maintenance will be carried out on a 60MVA power transformer and its associated switchgear at the Gwagwalada 330/132/33kV Transmission Substation.”

    According to TCN, during the maintenance period, the Abuja Electricity Distribution Company (Abuja DisCo) “will not be able to supply electricity to customers in Gwagwalada and its environs for four hours only.”

    The statement read, “The Transmission Company of Nigeria notifies the public that its engineers will conduct planned maintenance exercises at two transmission substations.

    • TCN restores power in Bayelsa after 3-month blackout

    “Today, Saturday, December 28, 2024, from 9 a.m. to 1 p.m., maintenance will be carried out on a 60MVA power transformer and its associated switchgear at the Gwagwalada 330/132/33kV Transmission Substation.

    “During this period, Abuja DisCo will not be able to supply electricity to customers in Gwagwalada and its environs for four hours only.”

    Similarly, the statement added that from 9 a.m. to 10 p.m. on Sunday, “maintenance work will be carried out on one of the 60MVA power transformers at the Kukwaba 132/33kV Transmission Substation.”

    This, according to TCN, will result in power interruptions in Wuye, EFCC, Federal Medical Centre, Coca-Cola, Idu Railway Station, Citec, and Life Camp.

    “Also, on Sunday, December 29, 2024, from 9 a.m. to 10 p.m., maintenance work will be carried out on one of the 60MVA power transformers at the Kukwaba 132/33kV Transmission Substation. This will result in power interruption in Wuye, EFCC, Federal Medical Centre, Coca-Cola, Idu Railway Station, Citec, and Life Camp,” it added.

    The company sincerely apologised for the inconvenience, noting that maintenance was scheduled to ensure the optimal performance of power equipment.

    “TCN apologises for the inconvenience this may cause, especially during the end-of-year and yuletide season. However, it is important that maintenance is carried out as scheduled for the optimal performance of power equipment,” the statement said.

    Earlier this month, TCN postponed planned maintenance on the 150MVA TR2 330/132/33kV transformer at the Gwagwalada 330/132/33kV Transmission Substation. The maintenance, originally scheduled for Saturday, 14th, and Sunday, 15th December 2024, was delayed due to poor power supply complaints from FCT residents.

    Share. Facebook Twitter Telegram WhatsApp

    Keep Reading

    Atiku Abubakar criticises Tinubu administration over 5,091 reported killings

    Atiku says 5,091 killings expose Tinubu’s security failure

    2027: INEC extends deadline for parties to upload candidates August 11

    2027: INEC extends deadline for parties to upload candidates August 11

    Messi farewell takes spotlight as South American qualifiers enter final stretch

    Messi faced multiple death threats during 2026 World Cup

    US condemns Chinese actions in South China Sea

    US condemns Chinese actions in South China Sea

    Niger residents protest abductions, block highway

    Niger residents protest abductions, block highway

    The police have released Osun State Commissioner for Environment, Mayowa Adejoorin, after almost 24 hours in detention.

    Osun commissioner released after police arrest

    Add A Comment
    Leave A Reply Cancel Reply

    Subscribe to News

    Be the first to get the latest news updates from ChronicleNG about world, sports, politics etc

    CAF Awards 2024: Nigeria's Super Falcons named team of the year

    Super Falcons lose automatic World Cup ticket after 1-0 Cameroon defeat

    August 9, 2026
    Atiku Abubakar criticises Tinubu administration over 5,091 reported killings

    Atiku says 5,091 killings expose Tinubu’s security failure

    August 9, 2026
    2027: INEC extends deadline for parties to upload candidates August 11

    2027: INEC extends deadline for parties to upload candidates August 11

    August 9, 2026
    Messi farewell takes spotlight as South American qualifiers enter final stretch

    Messi faced multiple death threats during 2026 World Cup

    August 9, 2026
    US condemns Chinese actions in South China Sea

    US condemns Chinese actions in South China Sea

    August 9, 2026
    Facebook X (Twitter) Instagram
    • Politics
    • News
    • Sports
    • Business
    • About Us
    © 2026 ChronicleNG

    Type above and press Enter to search. Press Esc to cancel.