Close Menu
Chronicle NG
    Trending Stories
    Terrorists killed nine members of a single family, including a two-month-old infant in a late-night attack in Plateau State.

    Terrorists kill nine family members in Plateau

    July 13, 2026
    PFIPC Scandal: Police to arraign controversial DG Tuesday

    PFIPC Scandal: Police to arraign controversial DG Tuesday

    July 13, 2026
    ISWAP terrorists

    Troops kill ISWAP cameraman, uncover foreign terrorist links in Borno operation

    July 13, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Terrorists kill nine family members in Plateau
    • PFIPC Scandal: Police to arraign controversial DG Tuesday
    • Troops kill ISWAP cameraman, uncover foreign terrorist links in Borno operation
    • WAEC, NECO fee hike will shut poor students out of education – Atiku
    • EFCC seeks to overturn N10m defamation award to Agunloye
    • US insists Strait of Hormuz is open despite strikes with Iran
    • US senator Lindsey Graham dies after ‘brief and sudden illness’
    • Lagos cracks down on illegal okada operations, impounds 309 motorcycles
    Facebook X (Twitter) Instagram
    Chronicle NGChronicle NG
    Subscribe
    Monday, July 13
    • News
      • Nigeria News
      • World News
      • Headlines News
    • Politics
    • Business
    • Sport
    • Entertainment
    • Contact Us
    Chronicle NG

    FG warns GenCos: Risk grid disconnection over non-compliance

    David GreatBy David GreatSeptember 1, 2025No Comments5 Mins Read
    Facebook Twitter Telegram WhatsApp
    Aso Rock dumps national grid, turns to ₦17bn solar project
    Electricity station
    Facebook Twitter WhatsApp

    The Federal Government has warned electricity generation companies, GenCos, of heavy penalties and possible disconnection from the national grid over non-compliance with operational standards.

    The Nigerian Electricity Regulatory Commission, NERC, issued the order following persistent grid collapses across the country. The directive, contained in Order No. NERC/2025/094, was signed on August 26, 2025, by the commission’s Vice-Chairman, Musiliu Oseni, and the Commissioner, Legal, Licensing & Compliance, Dafe Akpeneye. It became effective on September 1, 2025.

    At the heart of the order is the mandatory deployment of Free Governor Control, FGC, across all generating units. In power generation, a governor regulates the speed or output of turbines and generators, ensuring stable frequency. FGC allows turbines or generators to automatically adjust their output in response to changes in grid frequency, enhancing stability.

    According to the order, GenCos that fail to activate FGC on their units by November 30, 2025, “shall be liable to a penalty of a prorated 10 per cent of the invoice associated with the defaulting generating unit, and any generating unit that records 90 consecutive days of FGC non-compliance shall be disconnected from the grid.”

    The commission stressed that the measure is necessary to curb repeated disturbances and enforce strict compliance with the Grid Code. It explained that the initiative aims to “establish a structured framework for enhancing power generation reliability and stability of Nigeria’s power grid by ensuring strict compliance with operational frequency limits, implementing transparent monitoring mechanisms, and penalties for violations of the Grid Code.”

    • Tinubu nominates Abdullahi Ramat, two commissioners for NERC

    Citing section 34(1)(e) of the Electricity Act 2023, NERC said it is empowered to ensure safety, reliability, and quality of electricity supply, while section 34(2)(b) authorises it to establish operating codes and standards.

    It reminded operators that “Section 12.6.2 of the Grid Code for the Nigerian Electricity Transmission System requires all generating units to be fitted with fast-acting FGC that is capable of regulating turbine speed and adjusting power output based on frequency deviation exigencies, i.e., primary control.”

    The order added: “The FGC shall be sufficiently damped for both isolated and interconnected operation modes. The FGC and any other superimposed control loop (load control, gas turbine temperature limiting control, etc.) shall contribute to the primary control to maintain the unit within the generating unit’s capability limits.

    “Furthermore, the primary control characteristics shall be maintained under all operational conditions. Where a generating unit becomes isolated from the system but is still available to supply demand, the generating unit must be able to provide primary control to maintain frequency and voltage.”

    NERC recalled that the national grid suffered eight disturbances in 2024, including five full system collapses and three partial failures. Reports by the Transmission Company of Nigeria, TCN, linked many of the incidents to non-compliance with the Grid Code by some GenCos.

    The regulator explained that the new order is to ensure mandatory FGC activation in all generating units to boost reliability and “promote strict compliance with FGC requirements to minimise the risk of system disturbances and engender stable grid operations while establishing penalties for non-compliance.”

    It further directed that “GenCos shall at all times activate and operate the FGC in real-time without any time delays. GenCos are mandated to procure and supply a Grade Level 5 metering system with IoT-based monitoring capabilities for each generating unit and communicate readiness for installation to the NISO by 31 October 2025.”

    According to the order, “The Nigerian Independent System Operator shall install and integrate all IoT metering systems provided by the GenCos within 20 days of receiving notification of readiness for meter installation from each GenCo. NISO shall actively monitor and enforce strict compliance with the operationalisation of FGC mode in generating units. This shall be achieved through real-time data obtained from the Grade Level 5 IoT meters, ensuring accurate tracking, validation, and assessment of the performance of generating units.

    “NISO shall maintain real-time monitoring and record hourly compliance reports on the operation of FGC across all generating units. NISO shall compile and file monthly reports with the commission on the status of compliance with the provisions of the Grid Code on FGC to facilitate regulatory oversight.”

    On sanctions, the regulator declared: “Any GenCo that fails to comply with the provisions of sections 12.6.2 and 15.8.3 of the Grid Code on the integration and activation of FGC on all generating units by 30 November 2025 shall be liable to a penalty of a prorated 10 per cent of the invoice associated with the defaulting generating unit for the duration during which it was not operated with its FGC activated, that is, FGC non-compliant.

    “Where a generating unit records 90 consecutive days of FGC non-compliance, the affected generating unit shall be disconnected from the grid. Reconnection shall only occur after NISO has certified the unit as fully compliant with the requirements of the Grid Code.

    “NISO shall be responsible for determining non-compliance by defaulting GenCos and implementing penalties on the invoice and settlement of the affected GenCo. NISO shall handle the billing, payment processing, and dispute resolution for this penalty in accordance with Rules 28 and 29 of the Market Rules. NISO shall invoice defaulting GenCos the specified penalty amount as part of the monthly market settlement. The proceeds of the penalty shall be remitted to the Ancillary Service Account.”

     

    Share. Facebook Twitter Telegram WhatsApp

    Keep Reading

    Terrorists killed nine members of a single family, including a two-month-old infant in a late-night attack in Plateau State.

    Terrorists kill nine family members in Plateau

    PFIPC Scandal: Police to arraign controversial DG Tuesday

    PFIPC Scandal: Police to arraign controversial DG Tuesday

    ISWAP terrorists

    Troops kill ISWAP cameraman, uncover foreign terrorist links in Borno operation

    Atiku Abubakar criticises the proposed N50,000 WAEC and NECO examination fee, warning it will limit access to education for poor students.

    WAEC, NECO fee hike will shut poor students out of education – Atiku

    Former Minister of Power Olu Agunloye after the FCT High Court ruled that the EFCC defamed him over a $6 billion fraud publication.

    EFCC seeks to overturn N10m defamation award to Agunloye

    US President Donald Trump speaking as reports emerge that Israel shared intelligence alleging a new Iranian assassination plot.

    US insists Strait of Hormuz is open despite strikes with Iran

    Subscribe to News

    Be the first to get the latest news updates from ChronicleNG about world, sports, politics etc

    Terrorists killed nine members of a single family, including a two-month-old infant in a late-night attack in Plateau State.

    Terrorists kill nine family members in Plateau

    July 13, 2026
    PFIPC Scandal: Police to arraign controversial DG Tuesday

    PFIPC Scandal: Police to arraign controversial DG Tuesday

    July 13, 2026
    ISWAP terrorists

    Troops kill ISWAP cameraman, uncover foreign terrorist links in Borno operation

    July 13, 2026
    Atiku Abubakar criticises the proposed N50,000 WAEC and NECO examination fee, warning it will limit access to education for poor students.

    WAEC, NECO fee hike will shut poor students out of education – Atiku

    July 13, 2026
    Former Minister of Power Olu Agunloye after the FCT High Court ruled that the EFCC defamed him over a $6 billion fraud publication.

    EFCC seeks to overturn N10m defamation award to Agunloye

    July 12, 2026
    Facebook X (Twitter) Instagram
    • Politics
    • News
    • Sports
    • Business
    • About Us
    © 2026 ChronicleNG

    Type above and press Enter to search. Press Esc to cancel.